ガントレットの力で斧と鞭を持ち替えつつ戦う。斧は近接の火力武器、鞭は遠距離の敵にも攻撃が可能だ
(C) 2023 Atlas Fallen, a game developed by Deck13 Interactive and published by Focus Entertainment. Atlas Fallen, Focus Entertainment, Deck13 Interactive and their respective logos are trademarks or registered trademarks.
All other trademarks, registered trademarks or their logos belong to their respective owners. All rights reserved.
Amazon/楽天で購入

